Workshops on SMED and TPM in the wheel shop


     Five-day workshop guided by representatives of International Kaizen Institute Jorge Louis Barron and Luis Mendez were finished in the wheel shop.
     The team implemented new technologies of SMED in the bead ring line.
     The result was the reduction of changeover time from 3 hours to   42 minutes.
     All at once the first steps of TPM (Total Productive Maintenance) were implemented. In perspective the representatives of Kaizen Institute will conduct some educational workshops the main goal of which is sharing the experience of TPM and SMED implementation in other lines of the wheel shop.


All news



 
(0)